Insertec » Blog

The world is watching us

"The world is watching us. It's time to act. With this slogan, the COP25 climate [...]

Newsletter – November 2019

Winter Shutdown, corundum growth, Bauxal proyect...: Our newsletter is now available

PLASTIGUN, a new concept for Aluminium furnaces repairs.

In addition, Insertec has successfully developed the technology for the gunning of chemically agglomerated dense [...]

Tips for the maintenance of Reverberatory furnace.

The main advice is periodic maintenance. They are the best prevention. With this in mind, [...]

WINTER SHUT DOWN.-

The adhered corundum layer is initially soft and can be easily removed, but in later [...]

BAUXAL PROJECT- II

The preindustrial prototype for Paval refining with a Refinal´s capacity of 500tpy has been started [...]

Christmas shutdown inspections: corundum regrowth

The adhered corundum layer is initially soft and can be easily removed, but in later [...]

RENAULT Bursa Project,

in Turkey, where INSERTEC has supplied a 2000 kg/hr Fusora Tower and auxiliary equipment .

FURNACE REPAIRS

INSERTEC, Put at your disposal an engineering studies; Combination of Refractory castables and precast pieces [...]

NEW ORGANIC BLANKET

The soluble fibre blanket is manufactured using a unique spinning technology and is made from [...]

IDEX Our green furnace

The IDEX® is designed to give maximum flexibility together with minimum fuel consumption and emissions. [...]

BIG-BLOCKS- Aluminium Solutions

Refractory bricks have been used for the lining of reverberatory furnaces. For the installation of [...]

Why does corundum appear?

Corundum formation and its subsequent destruction of the furnace lining can be a constant worry [...]

FENAF 2019

Our subsidiary in Brazil has once again participated in FENAF, Sao Paulo from 17 to [...]

INSERTEC CHINA cumple 15 años 2004/2019

Nuestra filial está de celebración.