Insertec » Blog

IDEX Our green furnace

The IDEX® is designed to give maximum flexibility together with minimum fuel consumption and emissions. [...]

BIG-BLOCKS- Aluminium Solutions

Refractory bricks have been used for the lining of reverberatory furnaces. For the installation of [...]

Why does corundum appear?

Corundum formation and its subsequent destruction of the furnace lining can be a constant worry [...]

FENAF 2019

Our subsidiary in Brazil has once again participated in FENAF, Sao Paulo from 17 to [...]

INSERTEC CHINA cumple 15 años 2004/2019

Nuestra filial está de celebración.

THANK YOU for visiting our stand at the GIFA 2019 show!

We had a successful show and we could not make it with out you

SUMMER – Melting Tower

Some of our customer in Casting Aluminium, taking advantage in summer holidays to setting up [...]

Tilting Reverb Melter Aplication Report

illet Casthouse Melting unit Aluminium Tilting Reverb Melter MELTING PRODUCTION RATES  Furnace capacity.……………………………………………12 Ton Material [...]

UNITECR

Our R&D Manager attended las Unified Technical Conference on refractories, UNITECR, which took place last [...]

PROJECTS, summer 2015

During July and August 2015, INSERTEC has been undertaken more than 60 pojects of maintenance [...]

APLICATION REPORT of MELTOWER 5000kg/hr

Aluminium MELTOWER Furnace Continuous Melting furnace 5000 kg/hr on tower mode, for alloyed aluminium in [...]

INSERTEC.-Group

One of our strengths is the growth of our international structure. We carry several years [...]

Second edition of Refractories Engineering course

Between the 11th and the 14th of March the 2nd edition of the Refractory Engineering [...]

INSERTEC, & RENAULT collaboration

RENAULT – The RENAULT Group has officially started its new manufacturing Plant in Valladolid, devoted [...]

LADLE LINING

For a proper lining installation with bricks or castables, you must: Have basic knowledge of [...]